I started work on the railway layout last year but progress has been slow due to pressure of work and the sheer physical hard work of building the benchwork on two levels round a room 27' x 17' - especially the vexed issue of crossing the doorway, the "trundleduct".

One of the goals was to have a station in which a decent length train could stop without blocking the throat. These pictures show the station benchwork with a temporary track on which is an A3 pacific loco and fourteen coaches; the target is a rake of 13 Gresley teak coaches. I think it is big enough :-)

The double loop was closed and powered on 31 December 2008, you can now run round on both inner and outer double loops; next will be some more sidings and the start of ballasting and scenic work.

A good find: Daler-Rowney Gesso, a black acrylic primer/undercoat, applies direct to plywood and leaves a slightly porous surface which will take paint or PVA for gluing down scenery.


Not seen here (i.e. not started) is the sidings at the trundleduct end in the next corner from the branch operating well.